Shandong, China
Business Type:
Manufacturer/Factory
Number of Employees:
74
Year of Establishment:
2002-03-22
Management System Certification:
ISO9001:2015, ISO14001:2015, OHSAS18001:2007, API Secification Q1
Average Lead Time:
Peak season lead time: one month
Off season lead time: one month
OEM/ODM Service

3lpe Anticorrosion Production Line, 3PE Anticorrosion Production Line, 3lpe Coating Line manufacturer / supplier in China, offering Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line, API 3PE Fbe Steel Pipe/Tube Coating Eqipment High Voltage Electrostatic Spraying of Epoxy Powder System, Oil/Gas Steel Pipe 3PE/3lpe Anticorrosion Powder Spraying Powder Coating and so on.

Diamond Member Since 2018
Audited Supplier
Supplier Homepage Products 3PE coating production line Others 3PE coating production line Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line
  • Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line
  • Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line
  • Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line
  • Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line
  • Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line
  • Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line

Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $367,700/ Piece
Port: Qingdao, China
Production Capacity: 300 Sets / Years
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram
Type: Coating Production Line
Coating: Powder Coating
Substrate: Steel
Certification: CE, ISO, RoHS
Condition: New
Pipe Application: Oil and Gas Pipe, PU Foam Insualtion Pipe

You Might Also Like

Loading...

Basic Info

Coating Mehtod
Epoxy Powder Spraying Coating
Control System
PLC
Customized
Customized
Descaling Grade
SA2.5 Above
Trademark
Dacang/OEM
Transport Package
Standard Package
Origin
China

1. Standards :
Implement Standards and Specifications:
GBJ 50205Construction and acceptance of steel structure engineering
GB3095-82Mandatory air pollutants emission standards
SY/T 0315-0315External FBE coating technology standard of outer wall of buried steel pipe
SY/T 0420-02External wall of poly (PVC wrapping)Technology standard of buried steel pipe
GB16297-1996Air pollution comprehensive discharge standards
GB12348-90Standard of noise at boundary of industrial enterprises
JB/T 8355-96General technical conditions of shot blasting equipment
SY/T 0407-97 Steel surface pre-treatment before coating application
GB/T8923-1998Steel surface corrosion level and rust cleaning level before coating
GB/T15607-95Coating work safety specifications, electrostatic powder spraying process safety
Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line

2.  Technical Data Customerized (below example):
Pipe diameter range:                      Ф600~Ф3200  mm
Pipe length:                                      6~18 m
Max wall thickness:                         20mm
Capacity:                                           150m2 /h ~350m2 /h
Rust cleaning level:                         Sa2.5 above
Cooling cycle of water volume:    150m3 /h
Rated power:                                   4000KW
Compressed air consumption:      20m3 /min
Elevation of pipe bottom:              500 mm

Platform elevation:                         700 mm

3. Process:Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line


4.Description:
3PE anti-corrosion coating production line means the steel pipe is protected by three layer to prolong the life of use from 5-10years to 50-100years.
First layer is Fusion bonded epoxy layer (FBE> 100µm), the second layer of adhesive (AD) 170 ~ 250µm, the third layer of polyethylene (PE) 2.5 ~ 3.7mm. Present we can made the machinery for diameter range Φ159 ~ Φ1220.
3PE steel pipe outer coating has a high mechanical strength, excellent electrical insulation performance. The merits include high degree of mechanization, process parameters stable, not pollute the environment, etc. In recent years, the intensive of the pipeline corrosion engineering has been widely used.

The thickness of anticorrosive layer shall subject to the specification of the table listed below
DN
(mm)
FBE powder coating
(µm)
Adhesive layer
(µm)
Mix thickness of anticorrosive layer(mm)
(G)  Regular grade(S)      Strengthen grade    
DN£10080170~2501.8 2.5
100<DN£2502.0 2.7
250<DN£5002.2 2.9
500<DN£8002.5 3.2
DN³8003.03.7
Note: Anticorrosive coating of high mechanical strength area, with the provisions of strengthening level; In general, using regular grade.
Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line

5. Our Factory:
Dacang is rooted on technological innovation, has more than 40 patents, including several world's first ones. Dacang obtained ISO9001, ISO14001, OHSAS18001, API and many other international & domestic management system certification. Also we possess China's First Level Qualification for Anti-corrosion Construction, first level qualification for anticorrosion insulation engineering contracting, Class A qualification of pressure pipeline construction, Marine anticorrosive engineering construction qualification and other important business qualification. 
Dacang has high qualified and experienced teams for researching & designing, manufacturing and site operation.Our business covers the area of chemical, electric power, urban construction, etc. We are the top-ranked long-term coating plant supplier for CNPC(China National Petroleum Corporation), CPCC(China Petroleum & Chemical Corporation) and CNOOC(China National Ocean Oil Corporation) and other famous companies. Up to now, We have successfully entered the overseas markets of Singapore, Russia, India, Chile, Iran, Sudan, Algeria, Nigeria, Kazakhstan, Cyprus, Malaysia, Indonesia and so on. More than two hundreds of coating plant and one thousand of sets of equipment made in Dacang, which were widely used in the anticorrosive field in China and other countries. Moreover, we have carried on thousands of kilometers of coating pipe laying construction.

Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line

6. International Construction Projects:
Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line
In Jordan


Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line
In Colombia

Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line
In Chile


7. International System Certification:
Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line

8. Loading Pictures
Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line
Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line

Part of our loading photos

9. Question & Answer:
Q1. What the Dia. range your equipment can produce ?
A: We can produce four main Model:
Diameter of steel Pipe:
48-219mm.,219-1220 - mm,800-1600 - mm,1000-2400 - mm and 2400-3500mm.
Q2. What is grade of rust cleaning?
A:SA2.5
Q3. What certificate do you have? 
A:  ISO9001, ISO14001, OHSAS18001, API and many other international & domestic management system certification
Q4. What is the production time?
A: 2-3monthes after deposit.
Q5. which countries have you ever export to? 
A: Singapore, Russia, India, Chile, Iran, Sudan, Algeria, Nigeria, Kazakhstan, Cyprus, Malaysia, Indonesia and so on.
Q6. What about your after-sales service? 
A: One year guarantee, Lifelong after-sales service.
Three Layer Steel Pipe/Tube SA2.5 Above Patent Machine 3PE 3lpe Steel Pipe Anticorrosion Production Line




 

Send your message to this supplier

*From:
*To:
avatar Mr. James
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now